The rest of the acts of Hezekiah, with all his valor, and how he constructed the pool and conduit and brought water into the city, are recorded in the book of the chronicles of the kings of Judah.
This same Hezekiah stopped the upper outlet for water from Gihon and redirected it underground westward to the City of David. Hezekiah prospered in all his works.
After him, the work of repair was carried out by Nehemiah, son of Azbuk, administrator of half the district of Beth-zur, to a place opposite the tombs of David, as far as the Artificial Pool and the barracks.