Biblia Todo Logo
La Biblia Online

- Anuncios -





2 Chronicles 3:2 - Easy To Read Version

2 Solomon started the work in the second month of his fourth year as king of Israel.

Ver Capítulo Copiar


Más versiones

King James Version (Oxford) 1769

2 And he began to build in the second day of the second month, in the fourth year of his reign.

Ver Capítulo Copiar

Amplified Bible - Classic Edition

2 And Solomon began to build on the second day of the second month in the fourth year of his reign.

Ver Capítulo Copiar

American Standard Version (1901)

2 And he began to build in the second day of the second month, in the fourth year of his reign.

Ver Capítulo Copiar

Common English Bible

2 He began building in the second month of the fourth year of his rule.

Ver Capítulo Copiar

Catholic Public Domain Version

2 Now he began to build in the second month, in the fourth year of his reign.

Ver Capítulo Copiar




2 Chronicles 3:2
3 Referencias Cruzadas  

So Solomon began to build the temple. This was 480 years [30] after the people of Israel left Egypt. This was during Solomon’s fourth year as king of Israel. It was in the month of Ziv, the second month of the year.


Solomon began building the Lord’s temple {\cf2\super [22]} at Jerusalem on Mount Moriah. Mount Moriah is the place where the Lord came to David, Solomon’s father. Solomon built the temple on the place that David had made ready. This place was at the threshing floor {\cf2\super [23]} that had belonged to Araunah {\cf2\super [24]} the Jebusite.


These are the measurements Solomon used for building the foundation of God’s temple. {\cf2\super [25]} The foundation was 60 cubits {\cf2\super [26]} long and 20 cubits {\cf2\super [27]} wide. Solomon used the old cubit measure when he measured the temple.


Síguenos en:

Anuncios


Anuncios